03-19-1998 Regular MeetingDOWNTOWN DEVELOPMENT AUTHORITY
MARCH 19, 1998
6:30 P.M.
The Downtown Development Authority Architectural Review Committee met March 19, 1998 at
6:30 p.m. in the City Hall conference room.
Present was: A. Max Bacon, Chairman
Jim Pitts
Jimmy Wilson
C. J. Fouts
Willouise Spivey
Hubert Black
Doug Stoner
Harold Smith
Robin Broyles
Melinda Dameron
Howard Smith
Bill Lincicome with Post Properties presented their master plan for the redevelopment of the old
84 Lumber site at Spring and Atlanta Road including renovation and extension of the existing
building and construction of three additional buildings. Mr. Lincicome said they were asking
approval tonight for construction of the first building which will be utilized for the Post training
operation and which will be used for on -going classes. The first two buildings will be metal
similar to the original structure and the last building which will be used for their office, will be
totally brick. Included in their plans is heavy landscaping to including planted buffers around the
perimeter of the property to replace the chain link fence with 3" caliper red maples lining the
driveway. This building should be started mid to late summer, the next building starting 1 '/2 to 2
years away and the entire project completed in the next 3 to 5 years.
Hubert Black made a motion the entire master plan be approved, seconded by C. J. Fouts. Vote
on the motion was unanimous.
Robin Broyles advised the architectural guidelines were revised and approved by Council March
16, 1998 and they will now be referred to as standards rather than guidelines. When bound copies
are received thev will be distributed to all members.
With no fiirther business meeting adiourned at 6:50 p.m.
11 APPLICATION FOR CERTIFICATE OF APPROVAL
TW
APPLICANT:'�Wt�r4 i ��) TO BE COMPLETED BY PLANNING DEPARTMENT:
Date Received:
ADDRESS: (�t►g - Preservation
Map Reference: Oil A
TELEPHONE: -� �j0 ?A 0 1 I Action Taken:
A Certificate of Approval may be granted only in accordance with the requirements of The Smyrna Architectural Design
District Zoning Ordinance.
1. Address of property for which Certificate is requested:
Colo
2. For what activity is the Certificate requested?
'(l`� ��] 1`��►a,iv�-tc-.na�►�c� ���� (cli v� C I r�ir� �� �
3. What special conditions or circumstances, in your opinion, warrant the granting of a Certificate of Approval?
4. Attach building plans or proposed alterations, plans for reuse if appropriate, and a plat drawn to scale and showing
all property lines, with dimensions; location of buildings and other structures, creeks, and easements referenced to
the property lines; north arrow, land district and land lot number; location of setback lines or other requirements
I indicating the specific areas for which the Certificate is sought.
DATE: 1 q APPLICANT'
OWNER
TO BE COMPLETED BY THE PLANNING DEPARTMENT
Type of Certificate Requested Action of Review Board
Appurtenances: (i.e. walls, signs, fences, light fixtures,
steps, paving, etc.) Entire master plan approved to
include renovation and extension
of existing building plus
Demolition: construction of 3 additional
Relocation: buildings.
Protective Maintenance: Date Denied
New Construction: (including architecture, materials, Date Approved March 19, 1998
color, height of building) >
Tg.' ' 4.
-
DIRECTOR
—Ap p. # 9—